
Notable Projects
After clicking on a thumbnail, use your
browser's back button to return to this page.
St. Mary's R.C. Church, York, Pennsylvania
Images forthcoming
First Lutheran Church, Carlisle,
Pennsylvania
 |
Great and Positiv across from each other |
 |
Part of the solid state control system. |
 |
The Skinner Console |
 |
Great also speaks directly out to the sanctuary. |
 |
A look in the Great chamber |
 |
The positiv. |
 |
Looking from the altar to the back of the church. |
 |
A look at the Great from the console. |
|
|
Penn State University, State College,
Pennsylvania
 |
The Holtkamp at Penn State University. Note the
console lives in the garage below the organ. |
 |
Pouch Boards partially releathered. |
 |
Reinstallation of pouch board assemblies. |
 |
The Holtkamp style pouch boards getting final
preparation for releathering. |
 |
Hans making final inspections. |
|
|
Holy Trinity Lutheran Church, Lancaster,
Pennsylvania
 |
Console before renovation |
 |
Jamb wiring final stages |
 |
Repairs made to the carvings. |
 |
Console after renovation |
 |
All facade pipes and pipes from divisions on either
side of the organ case were removed for the church's renovation.
SDG restored finials and carvings. We made repairs to the severely
dented 18th century facade pipes and painted them. |
 |
Finials in the shop for cleaning. |
 |
Jamb wiring in process |
 |
View from the top. Finial removal. |
 |
View of organ including divisions to the sides of the case. |
| |
|
|
|
 |
Etchings on the back of one of the facade pipes in David
Tannenberg's own hand. |
